How Long Does It Take to Build a Gunite Pool?

Pool Planning Guides · May 18, 2026 · 6 min read

How Long Does It Take to Build a Gunite Pool?

How long a gunite pool takes depends on the design, the site, permits, and the weather. Gunite pools, often called concrete or shotcrete pools, take longer than fiberglass or vinyl liner pools because the shell is built by hand on your property and has to cure before the finish goes on. No honest builder can give you a firm number before seeing your yard. What we can do is explain each phase, what speeds it up or slows it down, and then give you a real schedule after a site visit.

It helps to split the project into two parts. Pre-construction covers design, pricing, approvals, and permits. Construction starts with excavation and ends when the pool is filled, the equipment is running, and the water is balanced. Many homeowners think the clock starts on dig day. It actually starts much earlier.

Pre-construction: design, contract, and permits

Design and planning

This is where the pool gets fitted to your property. You are not just picking a shape. You are deciding how the pool sits relative to the house, how it handles the slope of the yard and the way water drains, where the equipment goes, and how construction crews will reach the work area.

A simple design with quick decisions moves through this stage fast. A custom plan with a tanning ledge, a spa, water features, and lighting takes longer because there are more choices to make. Bulldog uses 3D pool design so you can see scale and placement before anything is dug. Time spent here is well spent: changes on paper are easy, and changes after excavation are not.

Pricing and contract details

Once the design is settled, the builder prepares pricing and specifications. This is when you should understand exactly what is included, which materials and equipment are specified, and what could affect the schedule later. It is also the right time to ask how the timeline is structured and which milestones to expect. For what drives the price itself, see our gunite pool cost guide.

Permits and approvals

Permitting is easy to underestimate because nothing visible is happening. Requirements and review times vary by city and county across Georgia, and some lots raise extra questions about grading, setbacks, or septic systems. If your neighborhood has an HOA, plan review can add another step. Once paperwork is submitted, this is one part of the schedule nobody can rush much.

Construction: the phases of a gunite build

For a closer look at what happens on site, see our step-by-step guide to the gunite pool construction process. Here is how each phase affects timing.

Layout and excavation

The crew marks the pool on the ground and starts digging. This is the day most homeowners feel the project has really begun. Excavation itself is usually one of the quicker phases, but rock, tree roots, groundwater, tight side access, and sloped ground can all slow it down. Georgia red clay holds a shape well when it is dry and becomes difficult to work when it is saturated.

Steel and plumbing

Next, steel rebar is tied into a framework that becomes the skeleton of the shell. Plumbing for drains, returns, and any feature lines is roughed in around it. A basic pool is straightforward. A spa, bubblers, water features, or automation add more lines and more coordination.

Electrical rough-in and inspections

Bonding, conduit, and early electrical work are completed before the shell goes in. Inspections are built into this part of the job. The crew may be ready for the next step and still have to wait for an inspector to sign off. That pause is normal and part of building a pool correctly and safely.

Gunite application

Gunite is a dry concrete mix that is combined with water at the nozzle and sprayed over the steel to form the shell. The shoot itself goes quickly, and the pool suddenly looks like a pool. It is not close to swim-ready yet.

Curing

The shell needs time to cure and gain strength before the interior finish is applied. Homeowners are often asked to water the shell regularly in the early days, especially in Georgia summer heat. Curing is the main reason gunite takes longer than some other pool types, and it should never be rushed. A well-cured shell is the foundation for everything that follows.

Tile and coping

Once the shell is ready, waterline tile and coping are installed around the top of the pool. Straight lines and standard materials go faster. Curves, raised walls, spillways, and detailed stone coping take more labor and precision.

Equipment, interior finish, and startup

The equipment is set and connected, and the interior finish is applied. The pool is filled right after the finish goes on, and startup begins. Water chemistry has to be managed carefully at first to protect the new surface, and the system is tested before handoff. Final inspections and an owner walkthrough close out the job.

What makes a gunite pool take longer

  • Customization. A simple rectangle moves faster than a pool with a raised spa, tanning ledge, raised beam, waterfalls, and premium finishes. None of those features are a problem. They just need more coordination and skilled labor.
  • Site conditions. Sloped lots, rock, poor drainage, tight access, fencing in the way, or underground utility conflicts all add steps before or during the build.
  • Weather. Rain is one of the biggest variables in Georgia. It can stop excavation, delay concrete work, and push inspections, even when crews are ready to go.
  • Inspections and permits. Review schedules are set by the local jurisdiction, not the builder.
  • Material lead times. Specialty tile, custom coping, upgraded interior finishes, and certain equipment packages may take longer to arrive. Confirm availability early.
  • Mid-project changes. Changing the shape, features, or finishes after work starts is one of the easiest ways to lose time.

Gunite compared with fiberglass and vinyl liner

Gunite usually takes longer on site than other pool types. That is the trade-off for flexibility. With gunite, the shape, depth, and features are built around your property instead of chosen from a fixed list of shells.

A fiberglass pool is factory-made and delivered by truck, so on-site work can move faster when access allows the shell to be set. Vinyl liner pools follow their own schedule as well. If you want a fully custom pool with integrated features, gunite is usually worth the extra time. For many homeowners, the better question is not only how fast the pool can be built, but how well.

How to keep your project moving

  • Start earlier than you think. If you want to swim by late spring or early summer, begin design and permitting well before the weather warms up. Our guide on when to start pool construction in Georgia covers timing by season.
  • Make selections early. Choose tile, coping, finish, lighting, and equipment before construction starts so crews are never waiting on a decision.
  • Stay responsive. Quick answers on approvals and paperwork keep the schedule tight.
  • Ask direct questions. A dependable builder should tell you plainly which parts of the schedule are predictable and which depend on weather and inspections.

The realistic answer

A gunite pool is built in phases for a reason, and each one needs to be done right. The best way to think about the timeline is as a guided plan, not a stopwatch. Some pauses are for inspections, some are for curing, and some are for dry weather. None of them mean the project is off track.

At Bulldog Pool Builders, we walk your property, look at access, soil, slope, and drainage, and then give you a schedule built around your site and design. You can read more about how we work on our process page or learn about our gunite pool construction service.

Ready to find out what your project would look like? Schedule a consultation or call (706) 705-7751, and we will walk you through the plan for your backyard.

Aerial view of a backyard with a swimming pool, patio seating, lawn, and surrounding hedge.

Start Your Pool Project

Let’s design something extraordinary.

Tell us about your property and what you have in mind. We will follow up to schedule a consultation and walk through design options, materials, and next steps.

Prefer to talk it through? (706) 705-7751 Monday – Friday, 8:00 AM – 5:00 PM

Schedule a Consultation

We typically respond within one business day.

  • Your info stays private
  • Reply within 1 business day
  • No obligation